713-518-9660

Home » Backflow Testing, Repair, Installation » Testing an RP for a transient meter on a fire hydrant.

Testing an RP for a transient meter on a fire hydrant.

Time to flush the Hydrant.

Time to flush the Hydrant.

Flushing the Line with Mapp Construction.  Thank You Tim

Flushing the Line with Mapp Construction. Thank You Tim

Getting Ready to Test the RP.

Getting Ready to Test the RP.

20141031_095048

Pressure across the number 1 check is strong above 5.0 LBS

Pressure across the number 1 check is strong above 5.0 LBS

Relief valve open above 2.0 LBS

Relief valve open above 2.0 LBS

You must be logged in to post a comment.